Skip to main content
James' HVAC logo
  • 0
James' HVAC logo
  • Account Home
  • Orders
  • Quotes
  • Pay Invoices
  • Reorder
  • Wishlists
  • Resolution Centre
  • Edit My Details
  • Edit My Address Book
  • HVAC
    • Components
      • AC Mounts
      • Condensation Pumps
      • Controller and Interfaces
      • Copper Pair Coil
      • Drainage
      • Duct Fittings
      • Filters
      • Flexible Duct
      • Gas Ducted Heater Accessories
      • Metal Capping
      • PVC Capping
      • Vents
      • Ventilation
    • Units
      • Split System
      • Ducted Refrigeration
      • Multi Split System
      • Bulk Head System
      • Evaporative Cooling
      • Cassette System
      • Gas Ducted Heater
      • Floor Console system
      • Window Units
      • Portable Air Conditioner
      • Air Purifier
      • Air Curtain
      • Jet Towels
  • Plumbing
    • Brassware
    • Civil
    • Copper
      • Copper Press Fittings
      • Copper Lengths
    • Cover plates
    • Hoses
    • Hot Water Systems
      • Heat Pumps
      • Gas Storage
      • Electric Storage
      • Gas Continuous
    • Hot Water Units Mounts
    • Hot Water Valve kits
    • Insulation
    • Safety
    • Tapware
    • Valves
  • Electrical
    • Emergency
    • Isolation Switches
    • Isolation Switch Mounts
  • Trade
    • Consumables
    • Tapes and Adhesives
    • Tools
    • Fixings
  • Spare Parts
  • Shop by Brand
    • Air Clean
    • Australian Valve Group
    • Ausmalt
    • Autoflo
    • AW
    • Bonaire
    • Daikin
    • Emerald
    • Etekcity
    • Iccons
    • iStore
    • iTemp Australia
    • Logi Civil
    • Logi Valve
    • Metforge Brassware
    • Metpress
    • Mitsubishi Heavy Industries
    • Mitsubishi Electrics
    • Monopoly Tapware
    • Omega
    • OVO Pumps
    • Pro1 IAQ
    • Rectorseal
    • Fujitsu
    • Rheem
    • Rinnai
    • Samsung
    • Stiebel Eltron
    • Teco
    • Titaflex
    • Titaseal
    • Zupper Tools
    • Click to Edit Name
  • About us
    • About Us
    • Register for Trade Account
    • Contact Us
    • Promos
      • Offers
      • Bundles
    • Shipping & Returns
  • Bundles

  1. Home
  2. HVAC
  3. Components
  4. Spare Parts
  5. Braemar Breezair Coolair - Pump 50 (Long Lead) Spare Part
Product main image

Braemar Breezair Coolair - Pump 50 (Long Lead) Spare Part

999294

$837.76
In Stock

Calculate Shipping



Free pick-up from store - FREE
Free Pick up from Store. 43 Greens Road, Dandenong South, VIC, 3175. Opening hours 7:00am - 4:30pm

Notify me when back in stock

Please tick this box to proceed.
  • Description
  • Specifications
    SKU 999294
    Brand Seeley International
    Shipping Weight 1.0000kg
    Shipping Width 0.300m
    Shipping Height 0.300m
    Shipping Length 0.300m
    Shipping Cubic 0.027000000m3
  • Reviews

    Be The First To Review This Product!

    Help other James' HVAC users shop smarter by writing reviews for products you have purchased.

    Write a product review

More From This Category

Braemar Breezair Coolair - Motor Pulley 140mm / 1A Taper Lock Spare Part
140X1SPA

Braemar Breezair Coolair - Motor Pulley 140mm / 1A

$443.52

Braemar Breezair Coolair - Exhaust Cover Grille Spare Part
250724

Braemar Breezair Coolair - Exhaust Cover Grille Sp

$73.22

Braemar Breezair Coolair - Valve Water Assembly Spare Part
103365

Braemar Breezair Coolair - Valve Water Assembly Sp

$51.39

Braemar Breezair Coolair - Window Slide Kit Rectangle Hole 105mm*210mm Spare Part
268220

Braemar Breezair Coolair - Window Slide Kit Rectan

$146.43

Braemar Gas - Injector 18 MJ/H Propane 0.95mm Spare parts
634234

Braemar Gas - Injector 18 MJ/H Propane 0.95mm Spar

$38.72

Bonaire - SCROLL PLASTIC 15" - Spare Parts
SPS156005SP

Bonaire - SCROLL PLASTIC 15" - Spare Parts

$1,692.82

Braemar Breezair Coolair - Wire Assy (RPA 700-900 new type) Spare Part
RPA1915

Braemar Breezair Coolair - Wire Assy (RPA 700-900

$302.72

Braemar Breezair Coolair - Winter cover (Side)              Spare Part
630922

Braemar Breezair Coolair - Winter cover (Side)  

$1,246.08

Stay In Touch

  • Facebook
  • Instagram
James' HVAC logo

Service

  • My Account
  • Track Order
  • Resolution Centre
  • Register for Trade Account

About Us

  • About Us
  • Our Blog
  • Contact Us

Information

  • Terms of Use
  • Privacy Policy
  • Returns Policy
  • Shipping Policy

Stay In Touch

  • Facebook
  • Instagram

Copyright © 2025 James' HVAC.
James Group ensures the accuracy of website information but cannot guarantee the absence of errors or omissions. We reserve the right to correct inaccuracies and update details without notice.
ABN: 69651078518

  • EFT Payment
  • Web Payments
  • Web Payments
  • American Express
  • MasterCard
  • Visa
TRADE PRICING LOGIN

Terms & Conditions

Welcome to our website. If you continue to browse and use this website, you are agreeing to comply with and be bound by the following terms and conditions of use, which together with our privacy policy govern James' HVAC’s relationship with you in relation to this website. If you disagree with any part of these terms and conditions, please do not use our website.

The term ‘James' HVAC’ or ‘us’ or ‘we’ refers to the owner of the website whose registered office is 43 Greens Road, DANDENONG SOUTH, VIC, 3175, AU. Our ABN is 69651078518. The term ‘you’ refers to the user or viewer of our website.

The use of this website is subject to the following terms of use:

  • The content of the pages of this website is for your general information and use only. It is subject to change without notice.
  • Neither we nor any third parties provide any warranty or guarantee as to the accuracy, timeliness, performance, completeness or suitability of the information and materials found or offered on this website for any particular purpose. You acknowledge that such information and materials may contain inaccuracies or errors and we expressly exclude liability for any such inaccuracies or errors to the fullest extent permitted by law.
  • Your use of any information or materials on this website is entirely at your own risk, for which we shall not be liable. It shall be your own responsibility to ensure that any products, services or information available through this website meet your specific requirements.
  • This website contains material which is owned by or licensed to us. This material includes, but is not limited to, the design, layout, look, appearance and graphics. Reproduction is prohibited other than in accordance with the copyright notice, which forms part of these terms and conditions.
  • All trademarks reproduced in this website, which are not the property of, or licensed to the operator, are acknowledged on the website.
  • Unauthorised use of this website may give rise to a claim for damages and/or be a criminal offence.
  • From time to time, this website may also include links to other websites. These links are provided for your convenience to provide further information. They do not signify that we endorse the website(s). We have no responsibility for the content of the linked website(s).
  • Your use of this website and any dispute arising out of such use of the website is subject to the laws of Australia.

Privacy Policy

Privacy Policy

Effective date: July 19th, 2020.

Tradies Supplies Online (“us”, “we”, or “our”) operates the www.jamesgroup.net.au website (the “Service”). This page informs you of our policies regarding the collection, use, and disclosure of personal data when you use our Service and the choices you have associated with that data. We use your data to provide and improve the Service. By using the Service, you agree to the collection and use of information in accordance with this policy. Unless otherwise defined in this Privacy Policy, terms used in this Privacy Policy have the same meanings as in our Terms and Conditions, accessible from www.jamesgroup.net.au

INFORMATION COLLECTION AND USE

We collect several different types of information for various purposes to provide and improve our Service to you.

TYPES OF DATA COLLECTED

PERSONAL DATA

While using our Service, we may ask you to provide us with certain personally identifiable information that can be used to contact or identify you (“Personal Data”). Personally identifiable information may include, but is not limited to:

  • Email address
  • First name and last name
  • Phone number
  • Address, State, Province, ZIP/Postal code,
  • City Cookies and Usage Data

USAGE DATA

We may also collect information how the Service is accessed and used (“Usage Data”). This Usage Data may include information such as your computer’s Internet Protocol address (e.g. IP address), browser type, browser version, the pages of our Service that you visit, the time and date of your visit, the time spent on those pages, unique device identifiers and other diagnostic data.

TRACKING & COOKIES DATA

We use cookies and similar tracking technologies to track the activity on our Service and hold certain information. Cookies are files with small amount of data which may include an anonymous unique identifier. Cookies are sent to your browser from a website and stored on your device. Tracking technologies also used are beacons, tags, and scripts to collect and track information and to improve and analyze our Service. You can instruct your browser to refuse all cookies or to indicate when a cookie is being sent. However, if you do not accept cookies, you may not be able to use some portions of our Service.

Examples of Cookies we use:

  • Session Cookies.We use Session Cookies to operate our Service.
  • Preference Cookies.We use Preference Cookies to remember your preferences and various settings.
  • Security Cookies.We use Security Cookies for security purposes.

USE OF DATA

James Group Pty Ltd uses the collected data for various purposes:

  • To provide and maintain the Service
  • To notify you about changes to our Service
  • To allow you to participate in interactive features of our Service when you choose to do so
  • To provide customer care and support
  • To provide analysis or valuable information so that we can improve the Service To monitor the usage of the Service
  • To detect, prevent and address technical issues

TRANSFER OF DATA

Your information, including Personal Data, may be transferred to — and maintained on — computers located outside of your state, province, country or other governmental jurisdiction where the data protection laws may differ than those from your jurisdiction. If you are located outside Australia and choose to provide information to us, please note that we transfer the data, including Personal Data, to Australia and process it there. Your consent to this Privacy Policy followed by your submission of such information represents your agreement to that transfer. James Group Pty Ltd will take all steps reasonably necessary to ensure that your data is treated securely and in accordance with this Privacy Policy and no transfer of your Personal Data will take place to an organization or a country unless there are adequate controls in place including the security of your data and other personal information.

DISCLOSURE OF DATA

LEGAL REQUIREMENTS

James Group Pty Ltd may disclose your Personal Data in the good faith belief that such action is necessary to: To comply with a legal obligation To protect and defend the rights or property of James Group To prevent or investigate possible wrongdoing in connection with the Service To protect the personal safety of users of the Service or the public To protect against legal liability

SECURITY OF DATA

The security of your data is important to us, but remember that no method of transmission over the Internet, or method of electronic storage is 100% secure. While we strive to use commercially acceptable means to protect your Personal Data, we cannot guarantee its absolute security.

SERVICE PROVIDERS

We may employ third party companies and individuals to facilitate our Service (“Service Providers”), to provide the Service on our behalf, to perform Service-related services or to assist us in analyzing how our Service is used. These third parties have access to your Personal Data only to perform these tasks on our behalf and are obligated not to disclose or use it for any other purpose.

ANALYTICS

We may use third-party Service Providers to monitor and analyze the use of our Service.

  • Google Analytics Google Analytics is a web analytics service offered by Google that tracks and reports website traffic. Google uses the data collected to track and monitor the use of our Service. This data is shared with other Google services. Google may use the collected data to contextualize and personalize the ads of its own advertising network. You can opt-out of having made your activity on the Service available to Google Analytics by installing the Google Analytics opt-out browser add-on. The add-on prevents the Google Analytics JavaScript (ga.js, analytics.js, and dc.js) from sharing information with Google Analytics about visits activity. For more information on the privacy practices of Google, please visit the Google Privacy & Terms web page: https://policies.google.com/privacy?hl=en

LINKS TO OTHER SITES

Our Service may contain links to other sites that are not operated by us. If you click on a third party link, you will be directed to that third party’s site. We strongly advise you to review the Privacy Policy of every site you visit. We have no control over and assume no responsibility for the content, privacy policies or practices of any third party sites or services.

CHILDREN’S PRIVACY

Our Service does not address anyone under the age of 18 (“Children”). We do not knowingly collect personally identifiable information from anyone under the age of 18. If you are a parent or guardian and you are aware that your Children has provided us with Personal Data, please contact us. If we become aware that we have collected Personal Data from children without verification of parental consent, we take steps to remove that information from our servers.

CHANGES TO THIS PRIVACY POLICY

We may update our Privacy Policy from time to time. We will notify you of any changes by posting the new Privacy Policy on this page. We will let you know via email and/or a prominent notice on our Service, prior to the change becoming effective and update the “effective date” at the top of this Privacy Policy. You are advised to review this Privacy Policy periodically for any changes. Changes to this Privacy Policy are effective when they are posted on this page.